contact form Contact Us 📞 1 225-424-8804

Case Study

CASE STUDY

Wind-turbine Demolition

As existing wind turbines approach their end of life, they must be reduced to small enough pieces that they can be transported to a disposal facility.

Wind-turbine blades are usually made from glass or carbon fibre in a polymer matrix. It is light, and tough material, and methods of demolition are limited.

Wind farms are often located in farmland, and it is essential that after cutting, the site is left free of debris.

Echidna excavator circular saws have proven to be an excellent tool for the cutting of wind-turbine blades on site.

Around Europe, wind farm installations where turbines are to be decommissioned, have benefited from the application knowledge and expertise of the local dealer ARVI (the Echidna dealer for Germany and Benelux).

The Echidna hydraulic circular saw solution offers these advantages over other techniques:

Equipment Used

D5HP High Speed Diamond Rocksaws

D5HP High Speed Diamond Rocksaws

Specification and technical information
For more information contact Echidna or ARVI
ARVI tho BV

ARVI tho BV

Magdalenastraat 26
4566-BB Heikant Nederland
Tlf: +31 (0)114 312826
E-mail:tristan(at)arvi-demolitiontools.com
www.arvi-demolitiontools.com/

  (Spam prevention)

More Case Studies